Three SY Class boilers were in the boiler shop at Tangshan Works on 29 March 1988, awaiting their turn to go to the erecting shop to be mated with frames. The left hand boiler is marked 1621 although this is not visible in the photograph. The other two are probably for SY 1619 and SY 1620.