JS.8167 pushed back from Dongbolizhan towards Kengkouzhan on its way down into the pit after shift change on 29 November 2018.
Even with an empty train, the climb out of Dongbolizhan was steep enough to make the engines work hard and occasionally the first train of the morning would slip to a stand and have to make a second run at the bank.