It took the combined efforts of SY.1025 and SY.1425 to lift this loaded train into Zhuangmeizhan on the morning of 28 November 2013. SY.1025 had attempted the move on its own but stalled on the bank and had to wait for SY.1425 to arrive and give a shove at the back.