By November 2014, the spoil operation based at Xibolizhan had been finished for several months. However, the workers train was still running from Dongbolizhan every morning but via the opencast pit as the direct line had been severed.
JS.8190 prepared to leave Dongbolizhan on the morning of 26 November 2014.