A long train of empties approached Zhengyang Colliery in soft morning sunshine on 28 November 2006, hauled by SY 0237 and banked by SY 0590. Zhengyang and Xinghua Collieries are located at the eastern end of the Chengzihe system, well outside the built up area, and send coal directly to CNR in long trains, often requiring two engines.