At the bottom of the pit the railway was laid directly on the coal seam and giant electric shovels excavated the coal from beside the track. It would soon be time to move the rails to the right and dig out the coal beneath where the train stood.
SY.1193 waited for its train to be loaded on 4 March 2009.