SY 1225 rolled into Wujiu Yard with around 30 coal loads from the Sanjing (Mine 3) loading point east of town on 21 November 2016.
This was one of only two daytime chimney-first steam workings during the five days we spent at Wujiu and both were downhill all the way. It even made Pingzhuang seem busy.