Fushun Special Steelworks still used SY Class 2-8-2s on some shunting duties in 2015.
SY.1633 eased a train of scrap steel over the Xifengnan Lu level crossing on 19 November 2015. Although access to the steelworks itself was not permitted, the line linking various parts of the site ran along the southern periphery and was accessible at a few points, such as here.