SY 1621's boiler was being lifted onto stands in the boiler shop at Tangshan Works on 29 March 1989. The boiler on the left, probably destined for SY 1619 or SY 1620, appeared to be set up for hydraulic testing with additional pipework and pressure gauges attached to the dome.