Most coal mines, however small, have railways of some sort and the pit behind Houba station on the Shiguai branch, east of Baotou, was no exception. Tubs were drawn up from the workings to the surface by an electric winch then rolled down to the unloading point by gravity. The donkey then coupled up to return the empty tubs to mine entrance.